崇三路技术标.doc
进入下载页
第一章  技术标书编制总说明
第一节 工程概况
本工程坐落于**新城,北起老陈海公路,南至**大道,道路全长1265米,规划红线宽度为45米。
本次实施桩号K0+000至K1+490,工程内容包括道路工程、铺设雨污水管、南横运桥、鳌山河桥。
☆ 道路横断面设计
横断面布置为:3.5m(人行道)+1.5m(绿化带)+3.5m(非机动车道)+1.5m(机非隔离带)+8.0m(机动车道)+9.0m(中央分隔带)+8.0m(机动车道)+1.5m(机非隔离带) +3.5m(非机动车道)+1.5m(绿化带)+3.5m(人行道)=45.0m
☆ 路面结构
◆ 机动车道结构为:
3cm  细粒式沥青混凝土(AC-13I)
9cm  粗粒式沥青混凝土(AC-30I)
40cm  粉煤灰三渣
15cm  砾石砂
◆ 非机动车道结构为:
3cm  细粒式沥青混凝土(AC-13I)
6cm  粗粒式沥青混凝土(AC-30I)
40cm  粉煤灰三渣
15cm  砾石砂
◆ 人行道结构为:
6cm  彩色人行道板
3cm  干拌水泥黄砂垫层
10cm  C25细石混凝土
10cm  级配碎石
☆ 桥梁工程
◆ 跨径布置:
南横运河桥为三跨:13.42m+13m+13.42m
鳌山河桥为三跨:10.42m+13m+10.42m
◆ 上部结构:采用钢筋砼空心板梁。
◆ 下部结构:基础采用Φ600PHC管桩,桥墩采用桩柱式桥墩。
◆ 桥梁附属设施
桥面铺装:桥面采用8㎝钢筋砼铺装+防水层+6㎝沥青砼面层,桥墩处桥面采用连续缝,桥台处设型钢伸缩缝。
☆ 排水工程
◆ 雨、污水管道:
管径Φ300—Φ400,管材
Preparation of technical tender Chapter General Information 
Section Project Profiles 
** This project is located in New Town, north old Chenhai Gong Road, south ** Boulevard, road length 1265 m, red line width of 45 meters. 
The implementation of the Stake K0 +000 to K1 +490, works including road works, the laying of rain water pipe, Southern Cross the bridge operation, Aoshan River bridge. 
☆ Road Cross Section Design 
Cross-section layout is: 3.5m (sidewalk) +1.5 m (green belt) +3.5 m (non-motor vehicle lanes) +1.5 m (machines with non-isolated) +8.0 m (motor vehicle lanes) +9.0 m (central reserve) +8 .0 m (motor vehicle lanes) +1.5 m (machines with non-isolated) +3.5 m (non-motor vehicle lanes) +1.5 m (green belt) +3.5 m (sidewalk) = 45.0m 
☆ pavement structure 
◆ Vehicle Road structure: 
3cm fine-grained asphalt concrete (AC-13I) 
9cm coarse asphalt concrete (AC-30I) 
40cm Fly Ash 
15cm gravel sand 
◆ structure of non-motor vehicle lanes: 
3cm fine-grained asphalt concrete (AC-13I) 
6cm coarse asphalt concrete (AC-30I) 
40cm Fly Ash 
15cm gravel sand 
◆ pavement structure: 
6cm colored sidewalk panels 
3cm dry mix of cement-sand-cushion 
10cm C25 fine aggregate concrete 
10cm graded crushed stone 
☆ Bridge 
◆ span arrangement: 
Southern Cross for the three cross the canal bridge: 13.42m +13 m +13.42 m 
Aoshan River Bridge for the three-span: 10.42m +13 m +10.42 m 
◆ Upper Structure: Reinforced Concrete Hollow Slab. 
◆ substructure: The foundation of Φ600PHC pile, piled pier by pier. 
◆ bridge ancillary facilities 
Deck: Deck 8-cm layer of reinforced concrete pavement + waterproof +6 cm asphalt concrete surface, using a continuous suture bridge pier Department, Office, located abutment steel joints. 
☆ drainage works 
◆ Rain, sewage pipes: 
Diameter Φ300-Φ400, pipe 
 