天津港南疆复线公路桥工程技术文件
1、综合说明
天津港南疆公路桥工程位于海河入海口处,在现状南疆公路大桥的北侧,两桥间距5米。复线桥桥长1209.46米,桥梁面积为3.2万平米。主要包括桥梁工程、道路工程、交通工程、照明工程。
1.1、工程简述
1.1.1、桥梁工程
南疆复线公路桥位于渤海西岸海河入海口,现状南疆公路大桥和南疆铁路
大桥的北侧,西端与津沽一线跨海滨大道立交相接,东端与南疆港区内主干道南港路相接。该大桥和现状南疆公路大桥是车辆进出南疆港区的重要公路通道。桥梁面积为3.2万平米,其中主桥面积为7663.8平米,引桥面积为24386.89平米。
线名 起止桩号 跨径布置 桥长
南疆复线公路桥 K0+055.31~K1+264.491 (4×32.6)+2×(3×32.7)+[48.6+3×64+48.6]+6×(3×32.7) 1209.46
注:()内为引桥;[ ]内主桥。
主要材料规格
a、混凝土材料:
1)预应力混凝土连续箱梁:C50
2) 普通钢筋混凝土墩柱:C35(标高在6.5米~-7米之间的墩柱需达F350)
3) 护栏地袱、桥面防水混凝土:C30
4) 钻孔灌注桩、承台:C35(且满足F350)
5) 桥台台身、桥头搭板:C30
6) 承台下混凝土垫层:C10
b、预应力钢筋:
1)、钢绞线:主桥及引桥所用钢绞线均采用ФS15.
Tianjin Port Double Line Highway Bridge Engineering and Technology document
1, the consolidated statement
Tianjin Port Road Bridge project is located at the mouth of the Haihe Department, the status of the north side of South Bridge, two bridges distance 5 meters. Double Track Bridge 1209.46 meters long, the bridge area of 3.2 million square meters. Include bridge engineering, road engineering, traffic engineering, lighting engineering.
1.1, Project Description
1.1.1, Bridge Engineering
Double-track road bridge in the southern Bohai Bank Haihe River estuary, southern status quo and the Southern Xinjiang Railway Bridge
The north side of the bridge, cross the western end of Beach Boulevard and the overpass Jingu line connecting eastern and southern ports, the main road connecting the South Road. The status of South Bridge and the Bridge is the southern port of vehicles entering and leaving the important road corridors. Bridge area of 3.2 million square meters, of which the main bridge area of 7663.8 square meters, an area of 24,386.89 square meters Approach.
Stake Line names beginning and ending long bridge span arrangement
South double track road bridge K0 +055.31 ~ K1 +264.491 (4 × 32.6) +2 × (3 × 32.7) + [48.6 +3 × 64 +48.6] +6 × (3 × 32.7) 1209.46
Note: () within the Approach; [] within the main bridge.
Main Material Specifications
a, Concrete Materials:
1) Prestressed concrete continuous box girder: C50
2) The reinforced concrete pier columns: C35 (elevation of 6.5 m ~ -7 meters of pier must reach F350)
3) The barrier to Fu, bridge deck waterproofing concrete: C30
4) pile, caps: C35 (and to meet the F350)
5) abutments, Slab: C30
6) The concrete pile cap cushion: C10
b, prestressed reinforcement:
1), strand: the main bridge and approach bridge the strand are used ФS15.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160792次
- Autocad2013 64位32位破解版附带注册机
- 148387次
- 天正建筑8.5破解版
- 144090次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123426次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73857次
- cad图集大全
- 56941次
- 11g101图集全套下载
- 45671次
- 中华人民共和国交通运输部-公路工程标
- 1009次
- 公路工程国内招标文件范本2003版
- 405次
- 新编路桥工程施工招标投标标书编制实用
- 391次
- 公路工程国内招标文件范本交公路发[200
- 379次
- 2003公路工程国内招标范本(承包商).D
- 365次
- 部监理专家《公路工程施工监理招标评标
- 325次
- 公路工程国内招标文件范本2003
- 280次
- 浙江省高速公路机电工程招标文件范本
- 272次
- 居甫渡公路二标技术文件(公路经典)
- 263次
- 湖北某公路隧道投标施工组织设计
- 247次