关于拼接路基施工的技术要求
主要内容:
扩建工程在每个标段按首件工程认可制的要求,选择具有代表性的施工段落作为施工试验段,来确定压实机具的组合、最佳含水量、松铺厚度、碾压遍数、施工工艺等。及时写出试验报告并报批。拼接路堤施工要求多点分段平行流水施工,确保在计划工期内完成路基拼接施工。每个施工段采取五流程、三阶段组织流水作业,确保施工进度。五流程即:1)施工准备:清表,修筑临时便道、临时排水设施,取土坑排水和便道,拆除护坡、边沟等;2)基底处理:填前翻松、掺灰并压实,开挖台阶等;3)分层填筑:按预定的松铺厚度上土,翻拌晾晒或补水,掺灰拌和、平整压实;4)分层检测报验:按规定自检,测量压实度、石灰剂量、含水量等,报请监理抽查,合格后进行下道工序;5)整修:每层完成后应对路基的边坡、坑槽、表层松散、剥落层进行整修,特别是雨后或间隔时间较长的填土层,需刮除松散层、洒水复压,保证层间接合不留夹层。三阶段即:1)填前翻晒或补水作业阶段;2)掺灰、(若必要时)平整、碾压阶段;3)自检、报验、复检阶段。
(承下页)
Subgrade construction on the technical requirements for splicing
Contents:
Lot expansion project in each of the first pieces of engineering accreditation system in accordance with the requirements, selection of representative works as a construction test section of the paragraph to determine the combination of compaction equipment, the best moisture, loose lay thickness, rolled several times, construction technology. Timely written test report and approval. Splicing embankment section parallel flow requirements more construction workers in the plan period to ensure the completion of construction of embankment splicing. Each construction stage process to take five, three-phase flow process organization, to ensure that construction progress. 5 process, namely: 1) construction preparation: clearing the table, construct temporary pavement, temporary drainage facilities, drainage and sidewalk access pits, removal of slope, ditches, etc.; 2) base treatment: turned loose before filling, mixed with ash and compaction, excavation level, etc.; 3) stratified filling: Shop predetermined thickness on the loose soil, turning dry or mixed supply water, mixed with ash mixing, formation compaction; 4) stratified detection inspection: self-test required to measure compaction, lime dose and water content, reported to the supervision of sampling, after passing to the next process; 5) renovation: each complete response to the roadbed slope, pits, loose surface, peeling off layer repair, in particular rain or after a longer interval fill soil, need to scrape loose layer of complex pressure water spray to ensure the layers together without leaving any indirect sandwich. Three stages, namely: 1) before filling or replenishment operation Fanshai stage; 2) Lime, (if necessary) formation, rolling phase; 3) self-test, inspection, re-examination stage.
(Bearing on next page)
 