水泥土搅拌桩技术交底

水泥土搅拌桩在桥台台后60米范围内采用。桩径55сm桩间距1.2~1.8米,梅花形布置,桩应穿过淤泥层0.5米当淤泥层厚度大于16米时,桩长按16米控制。
  一、材料:
     水泥采用普通硅酸盐水泥,强度32..5必须有出厂合格证和化验单,并按规范实验。水采用自来水或经化验合格的河水。
  二、施工工艺
1、 场地准备。清除地表杂土、腐植土、压实。
2、 测量定位。按设计要求的间距测放桩位。如要变更设计桩位,需经设计、监理同意。
3、 试桩
先按不同的地质段进行试桩,以掌握现场的成桩参数,拒此指导施工,试桩数不少于5根
4、 根据各段设计桩长,对钻杆用油漆做好标记,以便掌握钻进的深度。
5、 桩机定位对中,调正导轨的垂直度。
6、 预拌下沉到设计深度。
7、 提升喷浆搅拌。开启灰浆泵将水泥浆压入路基土中,边喷浆边旋转,边按试桩确定的提升速度提升搅拌机,停浆面比设计桩顶标高高出50сm。
8、 重复上、下搅拌,共四拌两喷。
9、 清洗。向集料斗中注适量的清水,开启灰浆泵,将管路中残存的水泥浆清洗干净,清除搅拌头上的土。
DJMP Technology Details <br> <br>Cement mixing pile in the bridge abutment used within 60 meters. 55сm pile pile diameter spacing 1.2 and 1.8 meters, plum-shaped arrangement, the pile should be through the mud when the mud layer thickness of 0.5 m greater than 16 meters, 16 meters length of pile under control. <br>  1, material: <br>     Cement with ordinary Portland cement, strength of 32 .. 5 certificate must have a factory and laboratory test, in accordance with standard test. Water with tap water or water tests qualified. <br>  Second, construction technology <br>1, site preparation. Clear the surface mixed soil, humus, compaction. <br>2, measuring orientation. According to the design of distance measurement up Pile. To change the design of pile position, subject to the design, supervision and consent. <br>3, test pile <br>Press the different geological sections test pile to pile parameters control the scene, refused this guide the construction, test piles not less than five <br>4, according to the design section of pile length on the drill pipe and marked with paint in order to grasp the depth of drilling. <br>5, pile driver positioning, the tone is guide rail perpendicularity. <br>6, ready-mixed sink to the design depth. <br>7, to enhance spray mixing. Open the ash slurry pump will be pressed into the soil subgrade, side spray side rotation, edge enhancement by test pile to determine the speed upgrade mixer, stop slurry surface elevation higher than the design pile top 50сm. <br>8, to repeat, on stirring, a total of four two-jet mixing. <br>9, wash. Hopper in the note to set the right amount of water, open the ash slurry pump, the remaining slurry pipeline in the clean, clear mixing head of the soil. <br>