塑料排水板施工技术交底
一、 材料
C型塑料排水板截面尺寸100×4.5mm,抗拉强度不小于130N/cm,要有出厂合格证,报监理认可。
二、操作工艺
砂垫层施工经监理认可后,进行施工。
1、放线:按梅花形布置,部位桩长见设计图L—11,根数见设计图L-13。           
2、塑料排水板要求穿过淤泥软土层及软弱下卧层进入砂层至少0.5m,排水板的最大施工深度按25m控制。插完后排水板伸出砂垫层20cm。
3、 遇鱼塘、甘蔗地、沟渠,必须排水晾晒,挖除植物根,铲平塘梗。
4、 如场地太软,则在表面铺荆笆、塑料编织、尼龙编织等土工合成材料后修筑道路,机械进场。
5、 50cm厚砂垫层用中粗砂,含泥量小于5%,干密度不得小于1.6g/cm3,压实厚度为50cm,砂垫层伸出路堤坡脚外1m,当路堤设计高度大于3.5m时,在砂垫层中加铺一层单向土工格栅,土工格栅的抗拉强度不小于50KN/m。另外,在与搅拌桩交接处前后各10米长采用双向土工格栅,其抗拉强度不小于50KN/m。
6、 塑料排水板接长时,必须采用滤膜内芯板平搭接的方式,搭接长度不得小于200mm。
7、 严格控制回带长度,不得超过500mm,否则要在附近补打,回带的根数应控制在总打设根数的5%以内。
8、 桩长与套管配合要适当,以免淤泥进入。
三、质量标准
塑料排水板施工允许偏差
Construction Technology Details of plastic drainage plate
One, materials
C-section size of plastic drainage plate 100 × 4.5mm, the tensile strength of not less than 130N/cm, have factory certification, accreditation reports supervision.
Second, the operation process
Construction Supervision approved by the sand cushion was conducted after the construction.
1, actinomycetes: by plum-shaped layout, site design pile length, see Figure L-11, root number, see design L-13.
2, plastic drain requirements through mud and soft soil into the soft underlying layer of sand at least 0.5m, the maximum drain depth of construction control by 25m. After drain plug out of sand cushion 20cm.
3, case of fish ponds, sugar cane, the ditch must be dry drainage, excavation of plant roots, stems pingtang shovel.
4, such as the site is too soft, the surface of shops in the Wattle Tree, plastic weaving, knitting and other geosynthetics nylon after the construction of roads, mechanical approach.
5, 50cm thick cushion used in the coarse sand, mud content less than 5%, dry density of not less than 1.6g/cm3, compacted thickness of 50cm, outside foot embankment sand cushion out of 1m, when the embankment design height greater than 3.5m, the increase in the layer of sand cushion in a one-way geogrid, geogrid tensile strength not less than 50KN / m. In addition, with the mixing junction 10 meters before and after the two-way geogrid, the tensile strength of not less than 50KN / m.
6, plastic drainage plate lengthening must apply membrane level within the core board lap of the way, Lap length not less than 200mm.
7, strictly control the back with a length of not more than 500mm, or up to fight in the vicinity, back to the root of the number should be controlled with the total number of Installation root less than 5%.
8, with the pile length and the casing should be appropriate to prevent silt entering.
Third, quality standards
Tolerance of plastic drain board construction
 