施工员交底内容:
1、在项目经理的领导下,负责施工单位工程(施工区域)的安全生产管理工作。
2、贯彻执行安全技术规程和措施。
3、经常检查工人执行安全操作规程的情况,坚决制止不顾人身安全、违章冒险蛮干的行为。
4、参加施工队组织的安全检查,对负责施工的单位工程的问题要及时负责整改。
5、发生工伤事故后,要及时保护现场,及时向上级报告,维护好伤员,参加事故处理,并做好工伤事故登记表,认真贯彻防范措施。
6、贯彻ISO9002质量体系,坚决执行本工程质量保证计划,使各项质量保证措施得以真正落实。
7、在施工过程中,认真贯彻执行有关的专业技术标准和设计文件,严格执行技术操作规程、验收规范和质量标准。
8、严格控制挖土深度,严禁超挖,第一层挖土深度为-4.5米,即支撑梁底标高,严格控制地下连续墙墙顶位移。
9、支撑系统圈梁截面为1200*800,主支撑梁截面为800*1000,八字梁截面为800*600,严格控制支撑梁的截面
Construction workers cards on the table contents:
1, under the leadership of the project manager responsible for project construction units (construction area) the safety management.
2, technical specification and implementation of security measures.
3, always check the situation of workers in the implementation of safe operation, determined to stop regardless of personal safety, illegal act recklessly risky behavior.
4, the construction team to participate in organized security checks, the unit responsible for the construction project for the rectification of the problem in time.
5, after the occurrence of accidents, to protect the site in a timely manner, promptly report to higher authorities, safeguard the wounded, to participate in incident handling, and accidents do register, conscientiously implement the preventive measures.
6, carry out ISO9002 quality system, strong quality assurance program for the implementation of this project, so that all quality assurance measures to be enforced.
7, in the construction process, and seriously implement the relevant professional technical standards and design documents, strictly implement the technical operation, acceptance of norms and quality standards.
8, strictly control the digging depth of over excavation is prohibited, the first layer of excavation depth of -4.5 m, the support beam bottom elevation, and strictly control the underground continuous wall top of the wall displacement.
9, ring beam cross-section support system of 1200 * 800, the main support beam section of 800 * 1000 800 * character beam section 600, strict control of beam cross-section support
 