交底内容:
1. 综合管沟工程防水等级为2级,主体结构采用防水混凝土,迎水面采用无机防水涂料涂刷,施工缝嵌钢板止水带,变形缝采用中埋式橡胶止水带。
2. 无机防水涂料的主要性能应符合《地下工程防水技术规范》(GB50108-2001)及《地下防水工程质量验收规范》(GB50208-2002)的相关规定。
3. 本工程采用的无机防水涂料有水泥基渗透结晶型防水涂料和水基渗透型防水涂料两种。中环路综合管沟除标准断面采用水基渗透型防水涂料外,其它部位采用水泥基渗透结晶型防水涂料;11号路综合管沟采用水泥基渗透结晶型防水涂料。
4. 综合管沟防水工程施工期间,要做好排水工作,地下水位应降低至防水工程底部最低标高以下至少30cm,直至防水工程全部完成为止。 基坑周围的地面水必须排除或控制,不得流入基坑。基坑中不应积水,如有积水,要排除,严禁带水或带泥浆进行防水工程施工。
5. 基面必须平整牢固。用2m长直尺检查,基面与直尺间的最大空隙不超过5mm,且每米长度内不得多于一处,空隙间只允许有平缓变化。基层表面应清洁干燥。当干燥有困难时,应涂刷潮湿基面处理剂。阴阳角处,均应做成圆弧形或钝角。
6. 所有的表面都应清除疏松的物质、脱模剂、油圬、胶及其它异物。如有必要,应用高压清洗法以除去污物、灰尘及尘垢。
(转下页)
Cards on the table contents:
1. Combined duct work for the two water levels, the main structure using waterproof concrete, welcoming the use of inorganic waterproof paint brush, construction joints embedded steel water stop, deformation joint rubber water stop using the underground.
2. Inorganic waterproof coating of the main performance should follow the "underground waterproof technical specifications" (GB50108-2001) and "underground waterproof construction quality acceptance" (GB50208-2002) with the relevant provisions.
3. This project used a cement-based waterproof coating inorganic capillary crystalline waterproofing coating and water-permeable waterproof coating two. In addition to the standard loop section of Combined duct infiltration by water-based waterproof coating, the other parts of the use of cement-based capillary crystalline waterproofing coating; on the 11th Road in trench with cement-based capillary crystalline waterproofing coating.
4. Combined duct during the construction of water works, drainage work to do, the water table should be lowered to the bottom of the lowest elevation of the following water works at least 30cm, until all the water project is completed. Surface water around the foundation to eliminate or control, not into the pit. Foundation should not be stagnant water, where stagnant water, to exclude prohibited conduct with water or water with mud construction.
5. Based solid surface must be formed. 2m long ruler and check with the base surface and the maximum gap between the ruler does not exceed 5mm, and the length of each meter shall not exceed 1, allowing only a moderate gaps between the individual changes. Primary surface should be clean and dry. When drying difficulties should be brushing wet-based surface treatment agent. Yin and Yang corner, should be made of rounded, or obtuse.
6. The surface should be cleared of all loose material, release agent, oil masonry, plastic and other foreign matter. If necessary, the application of high pressure cleaning method to remove the dirt, dust and grime.