您现在的位置:主页 > 路桥隧道 > 总结报告计划 > >>

五座桥施工技术总结.doc

资料评价:
★★★☆☆
更新时间:
2010-07-17
下载要求:
注册会员
文档大小:
0.02 MB
授权方式:
共享资料
上传会员:
龙龙
文档类型:
.doc
所属栏目:
总结报告计划
需要金币:
1
资料语言:
简体中文
资料简介:免费注册 本站会员可得金币,更多赚积分方法请查看:积分说明 下载地址

施工技术总结
 
一、工程概况
千禧鹊桥、田园桥、花桥、余庆桥、万寿龟桥及增加的引桥,是水上街市吉庆广场工程的组成部分,是联系各境点及各境区之间的走廊。由深圳市海上田园风光旅游开发公司兴建、东南大学建筑设计院设计、宝安监理公司监理、深圳市华侨建筑工程公司承建施工。桥身主体为钢筋混凝土结构,基础以φ550水泥搅拌桩为支承点在上设独立条型钢筋砼承台,桥高4.8m,桥长分别7m~12m,宽度m3.6~12m,五座桥总工程造价为136万元。
本五座桥工程于2001年9月10日相继开工,并于2001年12月5日全部完工,历时95天,工程质量达到优良。

二、施工管理及组织
我公司根据业主的使用要求,本着以主人翁的精神,以目标统揽全局,以经济承包为杠杆进行精心组织、科学管理,建立一个权限明确、责任清晰、分项细致、要求严格、高效率的管理组织机构和素质过硬的专业施工队伍,其形式和投入的主要人员及机械设备如下:
1、管理形式
Construction Technology
 
First, project survey
Millennium bridge of magpies, garden bridge, Huaqiao, Yuqing Bridge, Wanshou turtle bridge and increase bridge, water markets are an integral part of Kat Hing Square project is the contact point of the border and the border areas between the corridors. Rural scenery sea from Shenzhen Municipal Tourism Development Company to build, Southeast University Design Institute Building, Baoan Management Project Management Company, Shenzhen Overseas Chinese construction company contracted the construction. The main deck of reinforced concrete structures, cement treated base to φ550 supporting point for the independent bar in the design of reinforced concrete caps, bridge high 4.8m, bridge lengths of 7m ~ 12m, width m3.6 ~ 12m, five bridges The total project cost is 1.36 million yuan.
The five bridges project in September 10, 2001 have been started, and in December 5, 2001 completed and lasted 95 days, quality is excellent.

Second, construction management and organization
Our requirements under the owner's use, in line with the spirit masters, to target the overall situation, to contract as a lever for economic well-organized, scientific management, the establishment of a clear authority and responsibility clear, detailed breakdown, demanding, high-efficiency management organization and the quality of excellent professional construction team, in the form and input of key personnel and mechanical equipment are as follows:
1, form of management
 

帮助 收藏 报错 评论>>
五座桥施工技术总结下载
点击此处下载