§1  工 程 概 况

     高楼公路桥,设在高楼渡槽首部,位于高楼渡槽0#线至1#线之间,架立于高楼渡槽1#槽身之上,是高楼渡槽为解决省道57线(青岱线)跨越槽身而设置的一个小型附属桥梁工程。高楼公路桥按汽--20、挂—100,桥面净宽8.60M设计。桥宽为9M,桥长为12M,采用装配式钢筋砼空心桥面板,两侧设钢筋混凝土防撞栏杆,桥面顶高程为22.068M,与原公路以5%纵坡相连接,桥两侧填筑路面每边各长50M,宽9M,靠高楼乡政府侧路面浇20CM厚250#砼,靠大京镇侧路面铺18CM厚热沥青拌碎石。桥台采用钻孔桩双柱式钢筋砼结构,桩径D=1.0M,桩长6.465-15.46M,桩体型式为端承桩,桩尖均伸入强风化下限基岩面50CM以上。

 

§2  施工方案简述
一、 地基开挖与基础工程
    灌注桩施工共分四个过程:钻孔、清孔、钢筋笼制作安装、浇灌水下砼。
    其一,钻孔,共分六个步骤。
(1)、准备工作;
    ⑵、钢护筒埋设;
§ 1 Engineering Overview

     High-rise bridge, located in the tower's first aqueduct, aqueduct in the high-rise buildings to 1 # 0 # lines between the lines, frame stand tall above the aqueduct body # 1 slot, is to address the provincial highway 57 high-rise aqueduct line (green Dai line) across Aqueduct and set up a small subsidiary of Bridge Engineering. Tall highway bridge by steam - 20, linked to -100, deck net width 8.60M design. Bridge width 9M, bridge length of 12M, the assembled hollow reinforced concrete bridge decks, reinforced concrete crash bars located on both sides of the bridge deck elevation as the top 22.068M, with the original road longitudinal slope of 5% is connected to the bridge on both sides length on each side of the road embankment 50M, W 9M, high-rise township government side of the road by pouring 20CM 250 # thick concrete, the town side of the road by a large shop in Beijing 18CM thick hot asphalt mix gravel. Abutment piles by drilling two columns of reinforced concrete structures, pile diameter D = 1.0M, pile length 6.465-15.46M, pile size type as the pile, pile tip are inserted into the weathered bedrock surface 50CM floor above.

 

§ 2 Construction program brief
1, foundation excavation and foundation engineering
    Pile is divided into four processes: drilling, clean hole, reinforcement cage fabrication and installation, irrigation underwater concrete.
    First, drilling, consists of six steps.
(1), preparatory work;
    ⑵, Steel Casing;
 