深圳市田园海上风光旅游区游览步道区工程施工技术总结.doc
施工技术总结
深圳市田园海上风光旅游区游览步道区工程经过我司近十个月努力奋战,已胜利竣工。在此感谢建设单位、监理单位和其它各相关质监单位的大力支持与配合。
一、工程概况
本工程地处沙井镇民主村田园路以北,毗邻农耕文明馆展区,总建筑面积992.3㎡,基中服务建筑263.3㎡,其它729㎡。本工程由西向东依次为服务建筑、休息廊、公厕,三者已由田园路为进口的进化大道连接,西侧布置雕塑、花园、茶园等景点。其中,服务建筑共一层,为本工程设计主体构造为钢体蓬架结构。由平面间距尺寸为4.5m×4.5m钢柱拉张拉膜组合而成,共计七座,全部采用轻质泰柏板墙体,复合压型钢板屋面结构,服务建筑为三类防雷建筑场,休息廊位于本区中部靠东,弧形平面,内弧平径249m,全部木质结构,螺栓连接,公厕位于东侧进化大道口。管线中,污水管径200mm,与田园路市政污水管接通。雨水管径有d300、d400、d500三种,并设φ100砖砌圆形雨水检查井和单雨水口,与市政雨水管连通。给水管室外埋深0.7m,室内为明装,由田园路市政给水管引入。绿化浇灌给水管采用PVC管引自补水管,并在相应位置设室外洒水栓,埋
Construction Technology
Shenzhen Tianyuan Hai on the trails around the scenic spot of the Division works through my efforts in recent months fighting has been successfully completed. Like to thank the construction unit, supervision unit and other relevant quality supervision units in the support and cooperation.
First, project survey
The project is located in the town of democracy Murata Road, north of the manhole adjacent to agricultural civilization museum exhibition, with a total construction area of 992.3 square meters, building service based in the 263.3 square meters, the other 729 square meters. The project followed the service from west to east building, rest corridor, public toilets, three from rural road to the evolution of imports of road connecting the west layout sculpture, garden, tea garden and other attractions. Among them, the service building of floor-based design of the main body constructed of steel frame structures Peng. Distance from the plane size of 4.5m × 4.5m steel column pull-tensioned membrane composed of a total of seven, all with light TAP wall, composite steel plate roof structure, service building construction field for the three types of lightning , break Gallery is located in this area by the East Central, curved surface, within the arc flat track 249m, all wooden structures, bolt connection, public toilets in the evolution of major road junction east. Pipeline, the sewage pipe diameter 200mm, and the rural way connected to municipal sewers. Diameter rainwater have d300, d400, d500 three, and let φ100 circular brick water wells and one water port inspections, with municipal storm sewer connection. Depth to water outdoor 0.7m, indoors for the next installation, municipal water supply by the introduction of rural road. Green water use PVC pipe to the water drawn from fill pipe, and outdoor watering in the corresponding position of the bolt, buried
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160791次
- Autocad2013 64位32位破解版附带注册机
- 148387次
- 天正建筑8.5破解版
- 144090次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123426次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73857次
- cad图集大全
- 56940次
- 11g101图集全套下载
- 45671次
- 公路工程工程质量鉴定报告样板
- 600次
- 土方路基填筑试验段施工总结报告
- 407次
- 1027新华路项目定位报告(含产品建议)11
- 400次
- ***援外公路修复工程质量评估报告
- 398次
- 卓越:成都中天世纪地铁物业城北HOPSCA
- 390次
- 2011年中国双桥长盖板项目市场投资调研
- 383次
- 宁波***区道路、箱涵工程监理工作总结
- 382次
- 关于请求批准开发南谯区双桥门旅游度假
- 381次
- 隧洞洞内爆破观察报告
- 374次
- 中国公路运输行业分析报告
- 373次