香王互通式立交施工总结.doc
施 工 总 结
一 路线走向
香王互通式立交为位于西安绕城公路南段K76+249.789处,三层Y型加单喇叭型一级互通式立交设计,主线上跨西蓝高速公路,西接纺织北路,东与西蓝高速公路相连接,起点桩号为K75+200,终点桩号K76+600,全长1400m。担负两条高速公路的交通转换,是西安市东面的主要入口。
二.工程概况
香王互通式立交:共设计有7座桥梁,即主线桥、A匝道桥、C匝道桥、四座分离式立交桥;主线、匝道共有路基填方245667m3,挖方57866m3,其中8条单向匝道(A、B、C、D、F、G、H、K匝道),1条双向匝道(E匝道);6个通道,13个涵洞,四条被交线,
主线桥起点桩号为K75+705.96,终点桩号为K76+586.04,全长808.08m,双向六车道,桥面宽35m,与西蓝高速公路上交,交叉角度为50°。桥型布置右半幅2x(5x27)+(2x27+32+27.5+2x24) +(3x24+19.79+26.94+28.43+25.34)+2
x(5x27)m,左半幅 2x(5x27)+(2x27+26.5+3x27)+ (25+27+19.31+27.71+29.74+
18.74+25)+2x(5x27)m。上部结构均为钢筋砼单箱多室现浇连续箱梁。下部结构为摩擦桩基础,埋置式台,柱式墩,共有桩基318根,66座承台(包括系梁),128根桥墩柱,2座埋置式桥台。下部采用直径为Ф1.2 m摩擦桩,砼设计标号为25#;上部采用双幅单箱多室现浇连续箱梁,砼设计标号为30#。
A匝道桥:上部结构为(3X25+27.5+3X25)+5X20+5X24米钢筋砼单箱单室现浇箱梁。下部结构为圆形单柱及多柱式桥墩,埋置双柱式桥台,钻孔灌注桩基础。
C匝道桥:上部结构为4X20米钢筋砼单箱
Shi Federation Results
A route to
Hong Wang Interchange is located in Xi'an city loop highway are K76 +249.789 Department, the three Y-plus single-speaker type 1 interchange design, main line across the West Blue Highway, west of textile North, East and West Blue Highway connects from Stake to K75 +200, end Stake K76 +600, length 1400m. Responsible for two Expressway traffic conversion, is the main entrance to the east of Xi'an.
2. Project Profiles
Hong Wang Interchange: Total design of the seven bridges, the main line of the bridge, A ramp bridge, C ramp bridge, four separate overpass; mainline, ramp total of roadbed fill 245667m3, excavation 57866m3, including eight one-way ramp (A , B, C, D, F, G, H, K ramp), a two-way ramp (E ramp); 6-channel, 13 culverts, four are intersecting lines,
Stake for the bridge from the main line K75 +705.96, end Stake for the K76 +586.04, length 808.08m, two-way six-lane bridge voluminous 35m, and turned over to the West Blue Highway, cross angle of 50 °. Bridge-type arrangement Right Banfu 2x (5x27) + (2x27 +32 +27.5 +2 x24) + (3x24 +19.79 +26.94 +28.43 +25.34) +2
x (5x27) m, left Banfu 2x (5x27) + (2x27 +26.5 +3 x27) + (25 +27 +19.31 +27.71 +29.74 +
18.74 +25) +2 x (5x27) m. Reinforced concrete superstructure are single-box multi-room place continuous box. Substructure is pile foundation, Embedded platform, Shaft Piers, a total of 318 piles, 66 caps (including the tie beam), 128 pier column, two embedded abutment. Ф1.2 m with a diameter of the lower friction piles, concrete design grade of 25 #; upper single box with dual-rate multi-room place box girder, concrete design grade of 30 #.
A ramp bridge: the upper structure (3X25 +27.5 +3 X25) +5 X20 +5 X24-meter reinforced concrete box girder single box single place. Substructure for the round single-column and multi-column pier, embedded two-pole units, bored pile foundation.
Ramp C Bridge: the upper structure of 4X20 meters of reinforced concrete single box
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160791次
- Autocad2013 64位32位破解版附带注册机
- 148387次
- 天正建筑8.5破解版
- 144090次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123426次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73857次
- cad图集大全
- 56940次
- 11g101图集全套下载
- 45671次
- 公路工程工程质量鉴定报告样板
- 600次
- 土方路基填筑试验段施工总结报告
- 407次
- 1027新华路项目定位报告(含产品建议)11
- 400次
- ***援外公路修复工程质量评估报告
- 398次
- 卓越:成都中天世纪地铁物业城北HOPSCA
- 390次
- 2011年中国双桥长盖板项目市场投资调研
- 383次
- 宁波***区道路、箱涵工程监理工作总结
- 382次
- 关于请求批准开发南谯区双桥门旅游度假
- 381次
- 隧洞洞内爆破观察报告
- 374次
- 中国公路运输行业分析报告
- 373次