施 工 技 术 总 结

一、工程概况
新湖路(北段)市政工程,地处宝安新中心区。是由宝安区城市建设投资发展公司兴建,宝安区市政工程设计院设计,深圳市全安建设监理有限公司监理,深圳市华侨建筑工程公司第一分公司承建。
施工起点桩号0+060(X22353.464、Y96064.100)、终点桩号0+728.15(X21902.083、Y96556.643),全长668.15m,工程预算造价2997万元。
工程自1995年   月   日开始施工,但由于其他原因在中途于1996年   月   日暂停施工。之后在2000年   月   日由建设单位组织,重新签订承包合同,于2000年9月8日灰复动工,并在2002年10月1日按优良工程正式完成。
二、工程地质地貌特征
本工程施工路段原始地貌为潮间带,后经人工围成若干鱼塘。塘底高程为0.00m~0.8m,水深约为1.0m,塘埂高程2.0m~3.5m。施工段内除塘埂及水域区外,其中在0+150处有一条横穿路基的河道(咸水涌)。而0+060~0+120段全部被人工弃淤覆盖,高程在2.3m~3.8m。
地质构造经钻探揭示,自上而下分为:
Works summarization technology

First, project survey
New Rd (North) municipal works, the new center is located in Bao'an District. Bao'an District by the City Construction Investment Development Corporation building, Baoan District, Municipal Engineering Design Institute, Shenzhen City Construction Supervision Co., Ltd. All safety supervision, Shenzhen Overseas Chinese company's first office building construction.
Construction Stake from 0 +060 (X22353.464, Y96064.100), end Stake 0 +728.15 (X21902.083, Y96556.643), length 668.15m, project budget, cost 29.97 million yuan.
Project commencement date from 1995 years, but for other reasons in the middle of construction in 1996, closed years. Years after the date in 2000, organized by the construction unit to re-sign the contract, on September 8, 2000 re start ash, and October 1, 2002 formally completed by good works.
Second, engineering geological and geomorphological features
The construction section of the original landscape as the intertidal zone, the latter surrounded by a number of artificial ponds. Pool floor height is 0.00m ~ 0.8m, water depth of about 1.0m, pond ridge height 2.0m ~ 3.5m. In addition to paragraph mound construction and the waters outside the pond, which has an office in the 0 +150 across the embankment of the river (salt water Bay). And 0 +060 to 0 +120 section have all been abandoned artificial silt cover, elevation 2.3m ~ 3.8m.
Geological structure revealed by drilling, from the top down into:
 