水工专业毕业设计(土石坝工程).rar
工程地处我国华东钱塘江的支流上,为一发电为主兼顾灌溉,防洪的水利枢纽工程。在坝型比较阶段,比较了砼重力坝和粘土心墙砂壳坝两个方案。后者的枢纽布置如图1-1所示,坝高81m,坝顶长度370m,设计正常高水位为100m,校核洪水位为102m,大坝典型断面见图II-II。大坝属于二级建筑物。
溢洪道布置在坝址一公里的左岸凹口处(图中未示),为开敞正槽式,此顶高程为92m,总宽度64m,出口采用差动式鼻坎挑流效能。
引水式电站布置在右岸,引水洞长525m,直径7m,厂房安装50MW机组两台。
Project is located on a tributary of the Qiantang River in East China, mainly for irrigation and power generation, flood control water control project. Comparing stage in dam type, compared concrete gravity dam and the clay core programs Sand Dam 2. The latter layout shown in Figure 1-1, height of 81m, crest length of 370m, designed for the normal high water level 100m, check flood level for the 102m, a typical dam section shown in Figure II-II. Dam are two buildings.
Spillway at the dam site, one kilometer layout of the left bank of the mouth concave (not shown), is slotted to open, the roof height is 92m, the total width of 64m, export using differential flip bucket performance.
Power stations are deployed in the right bank diversion tunnel length 525m, diameter of 7m, factory installed two 50MW units.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160543次
- Autocad2013 64位32位破解版附带注册机
- 148312次
- 天正建筑8.5破解版
- 144047次
- autocad2012 64位32位 破解版(附注册
- 137474次
- 天正建筑8.2破解版
- 123394次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80812次
- 免费农村房屋设计图
- 73732次
- cad图集大全
- 56766次
- 11g101图集全套下载
- 45320次
- 水力计算手册(武汉水利电力学院)
- 450次
- 水工建筑物缺陷综合处理技术研究
- 403次
- 液压马达和液压泵的区别与联系
- 403次
- 水力学(武大 李炜等编)
- 402次
- 格兰富水泵(上海)有限公司
- 402次
- 水力学
- 400次
- 如何正确维护和解决计量泵的故障
- 400次
- 土坝浸润线观测资料整理分析方法
- 399次
- NIKKISO屏蔽泵资料
- 399次
- 小型水库工程
- 398次