机械回填土工艺标准.doc
机械回填土工艺标准
1 范 围
本工艺标准适用于工业及民用建筑物、构筑物大面积平整场地、大型基坑和
管沟等回填土。
2 施工准备
2.1 材料及主要机具:
2.1.1 碎石类土、砂土(使用细砂、粉砂时应取得设计单位同意)和爆破石碴,可用作表层以下填料。其最大粒径不得超过每层铺填厚度的2/3或3/4(使用振动碾时),含水率应符合规定。
2.1.2 粘性土应检查其含水率,必须达到设计控制范
Mechanical back fill process standards
1 Scope
This technology is applicable to industrial and civil buildings, structures large flat space, large pit and
Pipe trench backfill.
2 construction preparation
2.1 Materials and main equipment:
2.1.1 gravel type of soil, sand (with fine sand and silt units should be designed to obtain consent) and blasting stone ballast, the following can be used as filler surface. The maximum size shall not exceed the thickness of each layer filling of 2 / 3 or 3 / 4 (when using the vibrating roller), moisture content should be specified.
2.1.2 Cohesive should check their water content, must meet the design control Fan
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84341次
- 11g101图集全套下载
- 78883次
- cad图集大全
- 67445次
- 基土钎探工艺标准(103-1996)
- 681次
- 旋喷桩施工工艺标准
- 666次
- 建筑分项工程施工工艺标准—地基与基础
- 611次
- 基坑围护施工工艺
- 586次
- 井点降水工作示意图
- 413次
- 人工回填土工艺标准(104-1996)
- 399次
- 机械回填土工艺标准(105-1996)
- 382次
- 基坑支护组合钢内撑施工工法
- 365次
- 钻孔灌注桩施工工艺流程框图
- 364次
- 深基坑SMW工法支护设计-专家送审版
- 363次