_2002江苏建筑估价表.rar
总 说 明
一、《江苏省建筑工程单位估价表》(以下简称本估价表),是为编制省综合预算定额各综合项目基价的依据。该基价作为我省各市统一编制标底、标书和办理竣工结算的依据,并在此基础上计取间接费。本估价表适用于我省范围内一般工业与民用建筑的新建、扩建、改建工程。
二、本估价表编制依据:
1、《江苏省建筑工程预算定额》(一九八三年);
2、《全国统一建筑工程基础定额》(GJD-101-95);
3、《建筑安装工程劳动定额》LD/T72-94(DE),《建筑装饰工程劳动定额》LD/T73-94(DE);
4、南京市、部分无锡市二000年一季度建筑工程材料预算价格。
三、本估价表的作用:
1、编制江苏省建筑工程综合预算定额、估价表与综合定额配套之用;
2、总、分包单位或建设单位单项发包编制工程预算和办理竣工结算之用;
3、施工企业内部核算之参考。
四、本估价表由十四章及八个附录组成。其中:塔吊、施工电梯基础、塔吊电梯与建筑物连接件取定表供编制标底及标书报价之用,竣工结算时按其规定可作部分调整。
五、本估价表是按在正常的施工条件下,结合我省颁发的地方标准《江苏省建筑安装工程施工技术操作规程》(DB32)、现行的施工及验收规范和我省颁发的部分建筑构、配件通用图之作法进行编制的。
六、本估价表中规定的工作内容,均包括完成该项目过程的全部工序以及施工过程中所需的人工、材料、
General Description
First, the "unit valuation table construction in Jiangsu Province" (hereinafter referred to as the valuation table), is an integrated budget for the preparation of provincial fixed base price based on the comprehensive project. The base price for the preparation of base price of unified municipalities in our province, tenders and processing based on completion of settlement, and on this basis, taking into account indirect costs. The valuation table for the province within the new general industrial and civil construction, extension or renovation projects.
Second, based on the valuation table for:
1, "Budget Norm Construction in Jiangsu Province" (1983);
2, "the basis of a unified national building fixed" (GJD-101-95);
3, "construction and installation work quota" LD/T72-94 (DE), "architectural engineering work quota" LD/T73-94 (DE);
4, Nanjing, Wuxi City, in 2000 some of the first quarter of the budget price of construction materials.
Third, the role of the valuation table:
1, the preparation of consolidated budget scale construction in Jiangsu Province, the valuation table and integrated fixed matching purposes;
2, total, sub-unit or single unit construction bidding process completed the preparation of project estimates and billing purposes;
3, construction of internal accounting information.
Fourth, the valuation table by the 14 chapters and eight appendices. Where: Crane, construction elevator base, tower cranes and building connections to take the lift table of the preparation of bidding price and the tender offer for use, when completed settlement of its provisions may be some adjustment.
5, according to the valuation table is under normal construction conditions, issued by the local standards for the provincial economy, "Jiangsu Construction & Installation works Technology Regulations" (DB32), 现行 the construction and acceptance of our province issued Bu Fen Hu building structure accessories Universal charts prepared in practice.
6, the valuation tables Zhong Guiding the work content, including the completion of the project are Guocheng the whole process and construction process required in the labor, materials,
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160627次
- Autocad2013 64位32位破解版附带注册机
- 148336次
- 天正建筑8.5破解版
- 144062次
- autocad2012 64位32位 破解版(附注册
- 137474次
- 天正建筑8.2破解版
- 123404次
- autocad2010免费下载(简体中文版)
- 97153次
- CAD2008注册机及使用说明
- 80820次
- 免费农村房屋设计图
- 73771次
- cad图集大全
- 56839次
- 11g101图集全套下载
- 45443次
- 山东省安装工程消耗量定额定额说明(20
- 1695次
- 山东省市政工程消耗量定额及计算规则
- 1111次
- 全国统一市政工程预算定额编制说明
- 996次
- 《安装工程定额应用和安装工程造价》(
- 931次
- 全国统一安装工程预算定额说明
- 761次
- 03版的浙江定额(常用的几册)
- 743次
- 《浙江省建筑工程预算定额》(2003版)
- 719次
- 《安装工程定额应用和安装工程造价》(
- 633次
- 安徽20综合、装饰、安装定额库
- 608次
- 浙江03版定额工程费用费率电子版
- 564次