您现在的位置:主页 > 工程造价 > 施工合同 > >>

《建筑装饰工程施工合同》[乙种本].doc

资料评价:
★★★☆☆
更新时间:
2010-07-20
下载要求:
注册会员
文档大小:
0.02 MB
授权方式:
共享资料
上传会员:
龙龙
文档类型:
.doc
所属栏目:
施工合同
需要金币:
1
资料语言:
简体中文
资料简介:免费注册 本站会员可得金币,更多赚积分方法请查看:积分说明 下载地址

第一条  工程概况
  1.1工程名称:________________________________________________________________________
1.2工程地点:________________________________________________________________________
1.3承包范围:________________________________________________________________________
1.4承包方式:________________________________________________________________________
1.5工期:本工程自年月日开工,于年月日竣工:____________________________________________
1.6工程质量:________________________________________________________________________
1.7合同价款(人民币大写):____________________________________________________________
 第二条  甲方工作
  2.1开工前天,向乙方提供经确认的施工图纸或作法说明份,并向乙方进行现场交底。全部腾空或部分腾空房屋,清除影响施工的障碍物。对只能部分腾空的房屋中所滞留的家具、陈设等采取保护措施。向乙方提供施工所需的水、电、气及电讯等设备,并说明使用注意事项。办理施工所涉及的各种申请、批件等手续。
  2.2指派为甲方驻工地代表,负责合同履行。对工程质量、进度进行监督检查,办理验收、变更、登记手续和其他事宜。
  2.3委托监理公司进行工程监理,监理公司任命为总监理工程师,其职责在监理合同中应明确,并将合同副本交乙方份。
2.4负责保护好周围建筑物及装修、设备管线、古树名木、绿地等不受损坏,并承担相应费用。
2.5如确实需要拆改原建筑物结构或设备管线,负责到有关部门办理相应审批手续。2.6协调有关部门做好现场保卫、消防、垃圾处理等工作,并承担相应费用。
第三条  乙方工作
3.1参加甲方组织的施工图纸或作法说明的现场交底,拟定施工方案和进度计划,交甲方审定。
3.2指派为乙方驻工地代表,负责合同履行。按要求组织施工,保质、保量、按期完成施工任务,解决由乙方负责的各项事宜。
3.3严格执行施工规范、安全操作规程、防火安全规定、环境保护规定。严格按照图纸或作法说明进行施工,做好各项质量检查记录。参加竣工验收,编制工程结算。
3.4遵守国家或地方政府及有关部门对施工现场管理的规定,妥善保护好施工现场周围建筑物、设备管线、古树名木不受损坏。做好施工现场保卫和垃圾销纳等工作,处理好由于施工带来的扰民问题及与周围单位(住户)的关系。
3.5施工中未经甲方同意或有关部门批准,不得随意拆改原建筑物结构及各种设备管线。
3.6工程竣工未移交甲方之前,负责对现场的一切设施和工程
The first project overview
1.1 Project Name :________________________________________________________________________
1.2 Project Location :________________________________________________________________________
1.3 Scope of Contracting :________________________________________________________________________
1.4 Contract means :________________________________________________________________________
1.5 Period: from years on the project started, Yunianyueri completion :____________________________________________
1.6 Project Quality :________________________________________________________________________
1.7 contract price (RMB capital ):____________________________________________________________
Working Party Article
2.1 start the day before yesterday, to provide Party B confirmed the practice of construction drawings or instructions were, to the B field clarification at. All or part of the vacated vacated houses, clear the impact of the construction of the barrier. Only some of the houses vacated by the retention of the furniture, furnishings and other protective measures. B Construction to provide the necessary water, electricity, gas and telecommunications equipment, and explain the use of notes. Construction process involved in a variety of applications, approval documents and other formalities.
2.2 The site representatives appointed for the Party in charge of contract performance. On project quality and progress monitoring inspection, process inspection, alteration, registration and other matters.
2.3 Supervision company commissioned works supervision, supervision of the company appointed chief supervision engineer, his duties in the supervision contract should be clear and pay Party B copies of copies of the contracts.
2.4 is responsible for protecting the surrounding buildings and renovation, equipment, pipelines, old trees, green space, is not damaged, and bear the corresponding costs.
2.5 If the original really need Chaigai pipeline structure of the building or equipment is responsible to the departments concerned and the corresponding examination and approval procedures. 2.6 coordinate the relevant departments on-site security, fire protection, waste disposal, etc., and bear the corresponding costs.
Third Party Work
3.1 Party organizations to participate in the practice of construction drawings or site described correspondent, developed construction plan and schedule to Party approval.
3.2 designated as the representative of site B is responsible for contract performance. Required of construction, quality, quantity, finish the construction task, to solve the issues by the Party responsible.
3.3 The strict implementation of construction specifications, safety procedures and fire safety requirements, environmental protection regulations. Or practice in strict accordance with the instructions on the construction drawings and carry out quality inspection records. Final acceptance to participate in the preparation of project settlement.
3.4 to comply with state or local governments and relevant departments on the construction site management requirements, and properly protect the construction site around the buildings, equipment, pipelines, old trees from damage. Good construction site security and garbage off Namibia, etc., deal with the nuisance caused by construction problems and with the surrounding units (households) relationship.
3.5 Construction of the Party without the consent or approval of relevant departments, not free Chaigai of the original building structure and various equipment lines.
3.6 Prior to completion without the transfer of Party A is responsible for all on-site facilities and engineering
 

帮助 收藏 报错 评论>>
《建筑装饰工程施工合同》[乙种本]下载
点击此处下载