工程变更、签证管理办法

为了明确承包人和发包人双方的权益,减少施工、结算中因变更、签证不规范引起的纠纷和争议,特制定如下管理办法共同执行:

一、设计变更、现场签证的确认:
    设计变更、现场签证是施工图纸的补充部分,与正式施工图纸一样具有同等的法律效力,设计变更、现场签证一经确认,发包人和承包人双方必须按规定严格执行。
1、设计变更的确认:施工中,发包人需对原工程设计进行变更,其设计变更必须由设计院签发,格式执行建委规定的表格。
2、现场签证的确认:施工中承包人不得对原设计进行变更。由于图纸错误或工艺、标准等原因引起的变更,应由承包人根据现场的实际情况填写现场签证单,签字盖章后交监理公司,由监理工程师、甲方专业工程师签字确认后生效。手续不全者则视为无效签证。
3、施工中的隐蔽工程验收证明、施工会议记录、纪要、施工日志等均不能作为变更、签证的依据,更不能作为工程结算的依据。

二、执行变更、签证的程序和责任:
1、承包人在接到被确认的变更、签证后应根据变更、签证的具体要求执行。
2、承包人在施工过程中执行经确认后的变更、签证而导致合同价款的变更及造成承包人的损失由发包人承担,延误的工期相应顺延。
3、因承包人擅自变更设计发生的费用和由此导致发包人的直接
Engineering change, Visa Regulations

In order to clarify both the contractor and the contracting human rights, reducing construction and settlement due to changes in the visa irregularities caused by disputes and controversy is formulated as the joint implementation of management practices:

First, design changes, on-site confirmation of visa:
    Design changes, on-site visa is a complementary part of the construction drawings, construction drawings and formal and have the same legal effect, design changes, the scene of a confirmed visa, contracting and contractor 双方 date must be strictly Zhi Xing.
1, designed to confirm the change: construction, the developer is required to make changes to the original engineering design, design changes must be issued by the institute, the format form the implementation of the provisions of the Construction Commission.
2, on-site confirmation of visa: the construction contractor may not change the original design. As the drawing errors or process changes and other reasons caused by, the contractor shall fill out the actual situation according to the site of the single-site visa, signed and sealed by the Commissioner after the company submitted by the supervising engineer, Party A professional engineer sign it into effect. Incomplete procedures are regarded as invalid visa.
3, the construction of the hidden works acceptance certificate, construction meeting minutes, minutes, construction can not be the change log Deng Jun, a basis for visa, nor serve as a basis for settlement construction.

Second, the implementation of change, visa procedures and responsibilities:
1, the contractor identified in the receipt of the change, the visas should be based on changes in the implementation of the specific requirements of the visa.
2, the contractor in the construction process, confirmed after the implementation of changes to the visa changes caused by the contract price and the losses caused by the bidding contractor shall bear the delay of the construction period will be correspondingly extended.
3, due to unauthorized changes to the design contractor for costs incurred and the resulting direct contracting people
 