电渣压力焊焊接分项工程承包施工合同
发包方(甲方):项目经理部
承包方(乙方):
XXX工程钢筋竖向电渣压力焊焊接分项工程于一九九九年由甲方发包给乙方采用全包工包料方式承包施工。为了明确工程内容及双方责任,本着互相协作、分工负责的原则,根据本工程的具体情况,特商定如下条款,以双方共同遵守执行:
一、承包工程内容:钢筋竖向焊接包括切割、除锈所需材料设备的转运、电渣压力焊焊接的全部工作内容、材料及现场的文明施工工作。
二、承包造价:单价按焊接接头计算3.0元/每个(该单价包含乙方管理费及各类补贴费用在内)。
三、工程质量:乙方必须严格按照设计图纸及甲方现场的要求进行施工,确保工程质量达到设计和电渣压力焊质量标准及检验要求。
四、双方责任:
Electroslag welding sub-contracting project construction contract
Party giving (Party): Project Management Team
Contractor (B):
XXX pressure of reinforced vertical electroslag welding sub-project in 1999 contracted by the Party A to Party B all-contracting package for materials to the construction contract. In order to clarify both the content and responsibility of engineering, an atmosphere of mutual cooperation, division of responsibility, according to the specific circumstances of the project, agree to the following terms of the implementation of mutual respect:
A contractor on the project: the vertical steel welding, including cutting, rust materials and equipment required for the transfer, electroslag welding of all the work content, materials and site construction work of civilization.
Second, contracting costs: Price calculated by welded joints 3.0 yuan / each (Price includes B in the management fees and expenses, including various types of subsidies).
Third, quality: Party B must strictly follow the design drawings and the requirements of Party construction site to ensure the quality of the project to meet the design and electroslag welding quality standards and inspection requirements.
The two sides responsibilities:
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 项目开工仪式上的讲话稿
- 7911次
- 总工程师岗位职责
- 5616次
- 项目部管理制度汇编
- 2290次
- 钢筋班组劳务分包合同
- 2066次
- 低值易耗品管理制度
- 1498次
- 工程部管理制度
- 1492次
- 钢筋工承包合同
- 1233次
- 财务印章管理制度
- 1071次
- 公司安全专项施工方案专家论证审查制度
- 964次
- 晴雨表
- 962次