您现在的位置:主页 > 建筑工程 > 项目管理 > >>

甲方工程部全套管理办法.doc

资料评价:
★★★☆☆
更新时间:
2010-07-06
下载要求:
注册会员
文档大小:
0.02 MB
授权方式:
共享资料
上传会员:
lajks
文档类型:
.doc
所属栏目:
项目管理
需要金币:
1
资料语言:
简体中文
公告:免费注册 会员可立即获得金币,更多赚取金币方法请查看:金币说明 下载地址
资料简介:

一、合同管理办法:

1、为了规范合同签认程序,使现场施工管理程序化、规范化、标准化,制定本管理办法。
3、合同草案应由甲方起草,经双方共同讨论通过后先由乙方签字盖章。
4、本工程中由总包单位自行分包的施工合同应及时报甲方备案。合同应由相关部门经理及公司总经理审批后方可签订。
5、合同签署及审批人员必须对合同内容进行周密考虑及审查,以保证合同主要条款的合法性、严密性、可行性。合同签订后,甲方留存一份原件,财务部、投资预算部门及经办部门留存一份原件或复印件,其他部门需要留存合同的,由经办部门提供复印件。
6、合同内容应尽力实现公司利益最大化,充分体现公司价值取向;
7、各类业务分包(采购)合同金额(工程造价)在5万元以上(含5万元)必须考虑实行招标选择合作单位。各类招标项目预选投标单位应不少于三家。
8、工程类合同执行过程及完毕后,投资预算部门应持合同相关文件报财务部门备案。当经济合同签订后出现补充或更改时,应进行详细的文字说明备忘。
9、本工程钢筋及甲供设备定货合同应经丙方、乙方、甲方共同考察评比后依次签字盖章
二、施工质量控制办法
First, contract management approach:

1, in order to standardize identification procedures for signing contracts, so that on-site construction management procedures, standardization, standardization, development of the management.
3, Party A draft contract should be drafted, discussed and adopted by the two sides signed and sealed after the start with B.
4, the total package in this project by the construction of the flat sub-contract shall be filed and Times Party. Contract should be the manager and general manager of the relevant departments for approval before they can enter into.
5, the contract signed and approved the contents of the contract must be carefully considered and reviewed to ensure the legitimacy of the main provisions of the contract, strict, and feasibility. Contract signed, Party retained a originals, Finance, Investment budget departments and the handling department retained a copy of the original or other departments need to retain the contract, provide copies of the handling department.
6, contents of the contract should be made to achieve the interests of the company to maximize and fully embody the company values;
7 sub-types of business (procurement) contract value (construction cost) of 5 million yuan (including 5 million) must consider the co-operation with the tender selection. Units of various types of tenders not less than three pre-selected bidders.
8, engineering execution and completion of the contract, the investment budget for the department should hold the contract documents of the financial department. When the economy is added after signing the contract or changed, the text description should be detailed notes.
9, the reinforcement steel and a contract for equipment orders shall be subject to Party C, Party B, Party A joint order signed and sealed after inspection ratings
Second, construction quality control measures
 

帮助中心 收藏 >>>
甲方工程部全套管理办法下载
点击此处下载