建设工程设计合同(2).doc
建设工程设计合同(2)
建设工程设计合同(GF-96-0204)
项目名称:
项目建设地点:
合同编号:
(由承接方编填)
委托方:
承接方:
签订日期:
委托方(甲方):
承接方(乙方):
甲方委托乙方承担 工程设计,经双方协商一致,签订本合同。
第一条 本合同依据下列文件签订:
1.1 《中华人民共和国经济合同法》和《建设工程勘察设计合同条例》。
1.2 国家及地方有关工程察设计管理法规和规章。
1.3 建设工程批准文件。
第二条 本合同设计项目的名称、阶段、规模、投资、设计内容及标准:
Construction and engineering design contract (2)
Construction and engineering design contract (GF-96-0204)
Project Name:
Project Location:
Contract Number:
(Compiled by the undertaker fill)
Client:
Undertaker:
Date signed:
Client (Party A):
Undertaker (B):
Party A entrusts Party B undertake engineering design, both parties agree, sign this contract.
The first signing of the contract based on the following documents:
1.1 "The People's Republic of China on Economic Contracts Law" and "Construction Survey and Design Contracts Regulations."
1.2 State and local police the project design and management rules and regulations.
1.3 The construction approval document.
The second design of the contract, the name of the project, phase, scale, investment, design elements and criteria:
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 项目开工仪式上的讲话稿
- 7911次
- 总工程师岗位职责
- 5616次
- 项目部管理制度汇编
- 2290次
- 钢筋班组劳务分包合同
- 2066次
- 低值易耗品管理制度
- 1498次
- 工程部管理制度
- 1492次
- 钢筋工承包合同
- 1233次
- 财务印章管理制度
- 1071次
- 公司安全专项施工方案专家论证审查制度
- 964次
- 晴雨表
- 962次