01基土钎探工程.doc
一、 施工准备
(一) 材料要求
砂:一般为中砂。
(二) 主要机具
1、 工打钎:一般钢钎,用直径φ22~25mm的钢筋制成,钎头是60°尖锥形状,钎长1.8~2.1m;穿心锤(重10kg)。
2、 机械打钎:轻便触探器。
3、 其他:麻绳或铅丝、梯子(凳子)、手推车、撬棍(拔钢钎用)和钢卷尺等。
(三) 作业条件
1、 基土已挖至基坑(槽)底设计标高,表面应平整,轴线及坑(槽)长、宽均符合设计图纸要求。
2、 根据设计图纸绘制钎探点平面布置图,确定钎探点位置及顺序编号,按照钎探图及有关规定进行钎探并记录。钎探点的布置依据设计要求,当设计无要求时,应按规范规定执行,也可参照表l-l执行。
First, construction preparation
(A) material requirements
Sand: generally in the sand.
(B) Major equipment
1, drill work dozen: General drill rod, with a diameter of φ22 ~ 25mm steel bars made of drill bits is a 60 ° cone shape, drill length 1.8 ~ 2.1m; mandrel hammer (weight 10kg).
2, mechanical play filler: Portable sounding device.
3, Others: hemp rope or wire, ladder (stool), trolleys, lever (pull drill rod used) and the steel tape and so on.
(C) Operating conditions
1, the base soil has been dug to the pit (tank), the end of the design elevation, the surface should be flat, axis and the pit (slot) length, width are consistent with design drawings.
2, according to the design drawings floor plan of Probe soldering, brazing determine the location and serial numbers of Probe, drill for exploration in accordance with the provisions of solder and related exploration and recorded. Solder the basis of Probe layout design, when design has no requirements, provisions should be standardized, but also the implementation of the light table ll.
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84341次
- 11g101图集全套下载
- 78883次
- cad图集大全
- 67445次
- 机械回填土技术交底
- 799次
- 机械挖土技术交底
- 684次
- 灰土地基技术交底记录
- 622次
- 基土钎探技术交底
- 593次
- 地基与基础全套技术交底
- 525次
- 分部分项交底记录表基础土方回填
- 412次
- 明挖基础工程土方运输安全技术交底
- 409次
- 土方回填工程安全技术交底
- 403次
- 人工开挖冻土安全技术交底
- 400次
- 洞身开挖施工技术交底
- 392次