您现在的位置:主页 > 工程造价 > 投资估算 > >>

02水利工程设计概(估)算编制规定.rar

资料评价:
★★★☆☆
更新时间:
2010-07-21
下载要求:
注册会员
文档大小:
0.17 MB
授权方式:
共享资料
上传会员:
龙龙
文档类型:
.rar
所属栏目:
投资估算
需要金币:
1
资料语言:
简体中文
资料简介:免费注册 本站会员可得金币,更多赚积分方法请查看:积分说明 下载地址

一、为适应社会主义市场经济的发展和水利水电工程基本建设投资管理的需要,提高概(估)算编制质量,合理确定工程投资,根据建筑安装工程费用组成的有关规定,在水建[1998]15号文《水利水电工程设计概(估)算费用构成及计算标准》的基础上,并结合近些年水利水电工程自身行业特点,制定了本编制规定。它是编制和审批水利水电工程设计概(估)算的依据,也是编制工程标底的指导性标准。

二、本规定适用于中央项目和中央参与投资的地方大型水利水电工程。

三、工程的设计概(估)算应按编制年的政策及价格水平进行编制。若工程开工年份的设计方案及价格水平与初步设计概算有明显变化时,则其初步设计概算应重编报批。

四、本规定由水利部水利建设经济定额站负责管理与解释。
1, for the development of socialist market economy and infrastructure investment management Hydropower Project needs to improve almost (estimated) budgeting quality, reasonably determine the project investment, construction and installation cost of the project according to the composition of the relevant provisions in the Waters [1998 ] article 15, "Water Resources and Hydropower Engineering Overview (estimated) expenses and the calculation of the standard calculation" based on combining its own in recent years Hydraulic Engineering industry characteristics, established the provisions of this preparation. It is the preparation and approval of Water Resources and Hydropower Engineering Overview (estimated) the basis for calculation, but also guiding the preparation of standard engineering bidding price.

Second, this provision applies to the central project and the central place to invest in large-scale participation of Water Resources and Hydropower Engineering.

Third, the project design takes (estimated) operator should be prepared in the preparation of policies and price levels. If the project start the design of the year and the price level and the preliminary design estimates are significant changes, then the budget should be re-compiled the preliminary design approval.

Fourth, the requirement by the Ministry of Water Resources is responsible for management of water conservancy construction and interpretation of economic Dinge Zhan.

帮助 收藏 报错 评论>>
02水利工程设计概(估)算编制规定下载
点击此处下载